Clp revealed its preference on site location to the public three weeks ago without fully considering other viable site options for its lng terminal . clp has refused to release the draft eia preventing anyone from properly considering the impacts of the two sites in the eia or what other options were considered 三星期前,中电未有充份考虑其他兴建液化天然气接收站的可行选址,突然公布该机构的属意选址同时拒绝向外界披露有关的环评报告初稿,让人无从彻底研究报告中两个选址的影响,亦无法获悉其馀选址的位置。